Mushe whole wood customization

Whole wood custom construction safety 8 notes

Source: Mushe whole wood customization Publication time:2022-07-22

1. Safety helmets must be worn when entering the construction site and when operating. Operation at high altitude danger should be fastened with safety belt.

2. To carry out hole operations and other holes in the project and process needs so that people and things have the risk of falling or endanger personal safety for high work, must set up protective measures in accordance with the following provisions.

a. The hole of the board and wall, must set a solid cover, protective railing, safety net or other protective facilities against falling.

b. Construction site near all kinds of holes and pits and other places, in addition to setting up protective facilities and safety signs, the night should also be set up red light warning.

c. For people and things in the vicinity of the danger of falling other vertical holes, holes, should be covered or protected, and have measures to fix their location.

3. When working at height, the following provisions must be done in accordance with the protective measures.

a. When using ladders, the bottom of the ladder feet should be solid, not pad high use. The upper end of the ladder should have fixed measures. Standing ladder shall not have a missing file. When going up and down the ladder, must face the ladder, and shall not hold objects.

b. Operation platform must be set up around the protective railing according to the requirements of edge work, and should be arranged to climb the escalator.

c. Ascent operation should wear soft-soled shoes, according to the operating conditions, fasten the safety belt.

4. Operators should be qualified by education and training before taking up the job, and should comply with the safety production management system and safety technical operating procedures.

5. Before the operation, the work surface should be inspected in accordance with the current "Building Construction Safety Inspection Standards" JGJ59, and pre-shift safety education and safety technical briefing should be given to the operators.

6. When the height of wood veneer and super high door is greater than 3.6m, the operator should set up temporary horse stool scaffolding by himself, which should be stable and firm and meet the safety regulations, and prohibit the operation of scaffolding on the door and window gates or railings.

7. Strengthen the electrical and mechanical equipment "installation, use, maintenance, repair" four aspects of safety management. The use of electric machinery and equipment, electrical, mechanical properties of licensed personnel should know how to operate, without a permit personnel are not allowed to start and access to power, to prevent accidents and injuries: a. Temporary mobile lighting.

a. Temporary use of mobile lighting, must be used to safe voltage.

b. Hand-held power tools should first test run normal before use.

8. When using the man-ladder operation, should be operated in accordance with the following provisions.

a. Herringbone ladder should land on all corners, placed smoothly, ladder feet should be set up with non-slip rubber mat and insurance chain herringbone ladder feet should be pulled rope, ladder and the ground angle control between 40 ° ~ °, when working on smooth ground, the application of cloth wrapped around the ladder corners to prevent slipping.

b. Laying scaffolding board on the man-ladder, the length of scaffolding board should not be less than 20cm at both ends, and the middle of scaffolding board should not be operated by two people at the same time.

c. When the ladder is moved, the operator must come down, forbidden to stand on the ladder on stilts to move, the top hinge of the ladder is not allowed to stand, not allowed to lay the scaffolding board.

d. Herringbone ladder should be frequently inspected, found cracking, decay, loose wedge head, lack of gear, etc., shall not be used.